查看单个帖子
旧 2009-09-08, 10:43 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 equipment operating weight19seismic0

equipment operating weight!(seismic)
hi!
can anybody tell me if we have to consider the operating weight of the equipment as live load + dead load? another word, should we multiply cs by the operating weight to obtain the seismic load or just multiply by the empty load? could you refer me to cbc 2007 or aisc 7-05.
thanks a lot


reference asce 7-05 section 12.7.2 effective seismic weight item 3. that should answer your question.
also check ibc2006
thank you all!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)