查看单个帖子
旧 2009-09-08, 05:29 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 design method for debris shielding

design method for debris shielding
is there a standard practice for determining the loading on debris shielding used between steel bridge girders during concrete deck demolition? is there an equivalent uniform pressure that is commonly accepted, or does one have to approach it with newtonian physics?
thanks in advance to anyone who has advice.
no. i've seen specifications (mostly from railroads) that specifiy design loads for shielding including an impact load (usually 1000 # falling 6')and other specs that require the contractor to design shielding based on the anticipated demolition procedure.
there was an identical post some months ago.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)