查看单个帖子
旧 2009-09-08, 04:33 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 deck beam splice

deck beam splice
40'x6'deck supported by a ledger on one side and a (2)2x10 beam on the other. the beam would be bolted to 6"x6" posts at 10 ft o.c.
any recommendations on how to connect two beams at the same post or how to splice the beamas would be appreciated.
check out our whitepaper library.
might try checking out simpson's header hangers. say a hh4 hanger. vertical capacity = 1195 lbs.
or any of numerous simpson face mounted hangers.
see simpson catalog c-2007.
if the beams sit on the column and it they are droppped then i would use these.
put beams 6" apart and attach with through carriage bolts, (top of beam =top of post). use space between beams for diagonals in 40' direction.
thanks "civilperson"
the posts are continous that also support the canopy above but they can be cut and modified. when the beam is continous at the post location or at teh last post, there is no problem bolting them together. the problem would be at the beam splice. if spliced at the post locations the bolt edge distance would only be 1 3/8".
i am leaning towards face mounted hangers per "lkjh345".
or just do a side notch like this (top view) and put bolt it together
_________________________________
|________
_______________|______________
never, but never question engineer's judgement
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)