查看单个帖子
旧 2009-09-08, 01:24 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 construction bracing steel structures during erection

construction bracing steel structures during erection
does anyone have suggestion regarding published standards on temporary bracing for steel structures during erection work..
r
check out our whitepaper library.
they often use cables, 'u' claps and 'come alongs'...
dik
asce has a publication for guidelines for the design of temporary works and works under construction.
also robert ratay has an excellent text handbook of temporary construction.
i'm sure that other guidelines exist say by the aisc for example. and the ibc also.
that said, bracing in construction is usually left to the contractor with the design engineer specifying that that steel members shall be braced during construction/erection until all final steel pieces are in place.
in the case of bridges steel girders must be braced until the deck concrete has set.
regards,
qshake
eng-tips forums:real solutions for real problems really quick.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)