查看单个帖子
旧 2009-09-07, 01:54 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 augercast and driven concrete pile embedmen

augercast and driven concrete pile embedment
we do many jobs with driven concrete and augercast piles. our detailing has always shown the pile embedded 4" into the concrete pilecap and the bottom reinforcing 3" above that (for 7" total cover). i believe it is more/less industry standard in fl.
it seems to possibly be dated back when piles did not have reinforcing into the cap and embedment was actually a problem (for tension and fixed-head condition). now all of our augercast piles have continuous reinforcing into the cap and our driven piles have reinforcement drilled and epoxied into the pile and embedded in cap.
question: for compression and tension piles, does a 1" embedment seem reasonable? this lowers the bottom steel (better strut and tie) and creates shallower pilecaps.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)