查看单个帖子
旧 2009-09-07, 11:30 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 amassing of fresh concrete

"amassing" of fresh concrete?
hello,
at which α angle we don't need "upper" formwork to avoid "amassing" of fresh concrete?
thanx in advance
ps: hope amassing is the proper word which describe the problem.

check out our whitepaper library.
it would depend on the workability of the concrete mix
angle "alpha" depends on the slump of the concrete mix (and to some degree, the friction between the formwork and the plastic concrete). the lower the slump, the higher alpha can be. a practical limit to alpha is about 45 degrees with a slump of zero.
speed of placement also has an effect. the slower you place the concrete, the less likely "amassing" will be.
thank you ron for this valuable post.
is there a spreadsheet table that describes relation between formwork angle-slump-type of formwork?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)