welding plate on existing wf
welding plate on existing wf
q= vq/ i is the computation of stitch weld for bottom plate.. is v the actual max vertical shear? am confused what if i have a frame no vertical shear only horizontal force due to wind.. if i need to add plate at the bottom of wide flange.. how would i compute the welding.. i am confused.. can someone explain this to me.. thanks, see if wind load can be taken by beam (acting as column) as an axial load. than go with 3" in 12 " staggered weld. if beam cannot take it and needs cross-sectional area of plates also, than provide continuous weld. in aisc 13th edition, there is a section addressing welding of built up section subject to compression. it allows you to take as built sections as one , if they are welded continuously i guess. have a look please. so v is actual max vertical shear, for plate welding right? just want to be clear on that.. yes what if it's a column that need additional plate? do i weld the plate all the way or get the max v and stitch weld it? check if column needs plate for moment, axial force or shear and design weld accordingly edwin17th17 if i add wt on the flange of the web to increase axial.. does the wt need to go all the way to the base plate? am confused i have a beam connecting to column web.. if i add wt to column flange am i actually increasing the axial capacity of column per that beam connection.. i know in staad i can fool that but in reality the beam is only connected to column web and will not be connected to wt |
所有的时间均为北京时间。 现在的时间是 09:20 AM. |