几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量

几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 (http://www.dimcax.com/hust/index.php)
-   产品功能分析 (http://www.dimcax.com/hust/forumdisplay.php?f=10)
-   -   emporary design load during construction (http://www.dimcax.com/hust/showthread.php?t=29497)

huangyhg 2009-09-16 01:04 PM

emporary design load during construction
 
temporary design load during construction
according to asce 7-98 or 7-03, is there an allowable lateral design load reduction for temporary connections for a eifs lightgage wall panel over a 24 hr period until permanent connection is complete?


所有的时间均为北京时间。 现在的时间是 01:15 AM.