rebar installed costs
rebar installed costs
consider a concrete beam. would it be cheaper/cost effective to build this beam using (12)-#8 bars or (6)-#11 bars? check out our whitepaper library. a lot of things may factor into this.... just some questions one might have.... is there any re-steel coming into the beam from a column that may restrict beam bar placement? are there spatial constraints where #11 would be too cumbersome? how wide is the beam, will there be two rows of steel? tell us more. regards, qshake eng-tips forums:real solutions for real problems really quick. its a pile cap beam, 3'-10" in depth and 5'-0" wide. overall length is 9'-6", and there is a column with anchor bolts coming in at a location on the top (off center). due to the column and relative pile location (cantilever), the reinforcing is required at the top of the pile cap. cost-wise i think the difference is insignificant. i agree with qshake. possible geometric constraints are a bigger concern. have 12-#8 bars in the top of a cap that is 60" wide leaves only about 3.75" clear between them. that's not a lot of room for anchor bolts to fit in between or for vibrating the concrete. |
所有的时间均为北京时间。 现在的时间是 07:47 PM. |