几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量

几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 (http://www.dimcax.com/hust/index.php)
-   产品功能分析 (http://www.dimcax.com/hust/forumdisplay.php?f=10)
-   -   ibc 2000 - half stresses in masonry (http://www.dimcax.com/hust/showthread.php?t=25490)

huangyhg 2009-09-09 06:37 PM

ibc 2000 - half stresses in masonry
 
ibc 2000 - half stresses in masonry?
i have a project in which i am using the 2000 ibc, and am using the 2002 version of aci 530 for masonry design. i cannot seem to find the half-stresses provision for designing without special inspection that was given in the 1997 ubc section 2107.1.2. my question: is special inspection now provided for all masonry construction, or is the designer still allowed to use half-stresses without special inspection with ibc 2000?
find a job or post a job opening
ibc: half stresses are essentially gone. all masonry has some level of inspection (levels 1 - 3 in aci 530)
thanks. was this also the case for the 1999 aci 530?
i believe so...i think whenever you see the aci530 levels 1, 2, and 3 inspections, you aren't dealing with the older ubc special inspection 1/2 stresses anymore.


所有的时间均为北京时间。 现在的时间是 08:36 AM.